Implemented projects

PJSC TANECO

  • Analysis of Refinery units operation, development of recommendations to optimize process conditions which resulted in increase of light petroleum products production rate from 67.03% to 73.25%;
  • Development of recommendations for a fixed run of CDU-VDU-7 and Visbreaking Unit for 110% design load.
  • Development of technical assignments;
  • Preparation of ITB packages and analysis of technical and commercial proposals for detailed design of facilities for further Complex development;
  • Pre-tender assessment of bids for detailed engineering.

Back to the list