Implemented projects
JSC Gazprom Neftekhim Salavat
- Analysis and optimization of the strategic development plan for JSC Gazprom neftekhim Salavat refinery;
- Verification of Basis Engineering Documentation and Project Documentation for a catalytic cracking unit.
- Providing engineering and advisory services for implementation of project of construction CDU-VDU-6 (ELOU-AVT-6):
- CDU-VDU-6 commissioning and process stabilization;
- inspection of facilities for conformity with technical documentation to obtain the Statement of conformity;
- analysis of industrial safety system and providing recommendations;
- analysis of optimal schemes of connection of the new facility to the existing facilities and providing recommendations.
Back to the list